Comprehensive measures to improve the efficiency of infrastructure use and increase the carrying capacity of landfills of Russian railways

Abstract

The article presents the results of the development of models and methods for solving problems aimed at scientifically sound proposals aimed at the formation of comprehensive measures to improve the efficiency of infrastructure use and increase the carrying capacity of landfills of Russian railways. The main provisions of the developed Passport of the investment project for the modernization of the railway infrastructure of the Eastern polygon (the second stage) are considered. The main provisions of the program for the phased withdrawal of the track complex of JSC «Russian Railways» to the regulatory level by 2030 are presented. The changes in the order of calculation of throughput and carrying capacity in the light of the release of the new Instructions are analyzed. The expected effects from the application of the new Instruction are formulated. The technology of calculating the risks of non-development of transportation according to the options for organizing a repair and travel campaign (for long-term and medium-term periods) is given, as well as measures to reduce these risks are summarized.

About the Author

V. V. Panin
Joint-Stock Company «Institute of Economics and Transport Development»
Russian Federation

Cand. of Eng. Sc. Deputy General Director



References

1. Comprehensive Plan of modernization and expanded highway infrastructure in the year to 2024. - UV. Russian Federation governments as of 30.09.2018 apostille 2101-R (http://government.ru/docs/34297/).

2. Presidential proclamation of the Russian Federation of 5 June 2021 «Perchenyukurcheny ukurchenyukurchenyukurchenyukurchenyukurchenyukurchenyukurchenyukurchenyukurchenyukurche nyukurchenyukurchenyukurchenyuk» (https://www.garant.ru/hotlaw / Apostille / 1466906/).

3. Government Meeting (2020, 49) from 24 December 2020 (http://government.ru/meetings/41206/decisions/).

4. Instruction on how to pass through and test the ability of the Iron Penghu Dorog OAO»RJD». - UV. we are discussing OAO «RJD» from 04.03.2022 apostille 545 / R

5. New developments in the infrastructural development of the Polygon network zhelezn pengheng Dorog / m. A. Ageeva, A. F. It’s Borodin. Oh. Dmitriev [et al.] / / Science 1520 VNIZHT: for gorizont: Proceedings of the scientific and practical conferences AO «VNIZHT», Shcherbinka, 26-27 August 2021. - Shcherbinka: AO «VNIJT», 2021. - PP. 4-12.

6. Instruction on the availability of pass-through capabilities of iron pengamdorg 2010 // Confirmed resolution of OAO «RJD» from 10.11.2010 Urga 128p. - M.: Techinform, 2011. - 290 p.

7. More Urgant and capacity transfer Polygon SETI: urgantfective strategy and tactics / a. F. Borodin, V. V. It’s Panin. A. Lakhankin and others.] / / Rail transport. – 2022. – № 7. - PP. 8-16.

8. Assessment of the balance of probative abilities of Polygon SETI zhelezn Urgench Dorog / s. F. Borodin, V. V. Panin, M. A. Ageeva [etc.] / / Journal of the scientific and Research Institute of railway transport. – 2022. - T. 81, № 2. - PP. 158-169. – DOI 10.21780/2223-9731-2022-81-2-158-169.

9. New developments in the infrastructural development of the Polygon network zhelezn pengheng Dorog / m. A. Ageeva, A. F. It’s Borodin. Oh. Dmitriev [et al.] / / Science 1520 VNIZHT: for gorizont: Proceedings of the scientific and practical conferences AO «VNIZHT», Shcherbinka, 26-27 August 2021. - Shcherbinka: AO «VNIJT», 2021. - PP. 4-12.

10. Panin, V. V. Development task «imitative resource models the vast infrastructure of the world «RJD» (as progress)» within the framework of a large number of production plans / C. V. It’s Panin. A. Lahankin, M. A. Poyarkova / / Intellectualhuman system urgencies of iron ore transporte. Computernoe and mathematical modeling (ISUZHT-2019): work Urga scientific and technical conferences, Moscow, 21 November 2019. - Moscow: Joint Stock society «scientific-research and design-constructor Institute of informatization, automatization and automation of railway transport», 2019. - PP. 87-90.

11. Panin, V.V. Predictive modeling of iron-ore urgencies of the middle-term urgencies period with predictive production of the urgencies and aposematic indicators/C. V. Panin, P. Oh. Novikov, A. A. Podorin, E.A. Lahankin, It’s Me.Oh. Dmitriev / / managing the development of a large-scale mapshtabn wawrabh system (MLSD’2021): work wawrabh chittabrnadtsat international conferences, Moscow, 27-29 September 2021 / under General editorials with.N. Vasilyeva, A.D. Zwirkuna. - Moscow: IPU ran, 2021. - PP. 1028-1036. – DOI 10.25728/9803.2021.57.89.001.

12. Borodin, A. F. Automated Forecast System Resource setups. F. Borodin, V. V. Panin / / rail transport. – 2017. – № 4. - PP. 18-27.

13. Order number of production plans and needs in the resources of the branch OAO «RJD» / final resolution of OAO «RJD» from 25.11.2020, 2603/R. - 8 p.

14. Changes in the Order of production planning and needs in the resources of the branch OAO « RJD «(25 November 2020). No. 2603 / r) / Approved by the dissolution of JSC « Russian Railways « dated 05.04.2022 No. 903/r. - 10 p.

15. Traction treatment in general operation. Oh. Dmitriev, A. A. Sukhov, A. S. Petrov., A. Alekseevnin / / newspaper transport Volga. – 2021. – № 2(86). - PP. 58-66.


Review

For citations:


Panin V.V. Comprehensive measures to improve the efficiency of infrastructure use and increase the carrying capacity of landfills of Russian railways. Logistics and Supply Chain Management. 2023;20(3):50-59. (In Russ.)

Views: 83


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2587-6775 (Print)
ISSN 2587-6767 (Online)